|
作为屏蔽室的厂商,我们经常说起法拉第笼。我们提供一个关于最近完成的一个法拉第笼项目的简介。如果想得到更完善的资料请查阅我们的参考资料页。
|
|
|
| 04.04.2010 |
 |
COMTEST receives ISO-9001 certification. |
|
Following a process lasting almost one year, Comtest Engineering BV has had its work processes accredited to the internationally recognized quality management system standard, ISO 9001: 2008.
Awarded by Quality Masters, a Dutch leader in quality assurance for business, government and society, the designation certifies that Comtest has met the highest standards of good management practices and formalized business processes.
|
|
|
|
| 29.06.2009 |
 |
June 2009 COMTEST delivers RF shield room in SKA projec |
|
Within the Radio Astronomy project called: SKA, Square Kilometer Array,
Comtest delivered high performance mobile RF shielded computer rooms.
Based on our yearlong experience of RF shielding design and production
Comtest produced 4 mobile RF shielded and conditioned computer rooms
housed in 20ft High Cube sea containers. The RFI shielded rooms will
be used to house all the computer systems and have excellent shielding
performances over a large frequency range. To avoid emissions reaching
the sensitive antenna arrays each room is equipped with a RF sluice
to ensure there is always a closed RF shielding.
More information on the SKA project and the delivery of the RFI containers can be read in
this pdf file.
|
|
|
|
| 04.06.2009 |
 |
COMTEST at EMC 2009 in Beijing |
|
Comtest was present at EMC 2009 in Beijing, China.
Date: June 16th - 18th, 2009
Venue: Beijing International Convention Center
Booth N°: 05 & 06
|
|
|
|
| 04.06.2009 |
 |
ISO 9001:2008 QA |
|
In order to ensure our customers that we constantly strive to improve quality and reliability, Comtest has started to implement a quality management system according to the ISO 9001:2008 standards. The goal is to get the ISO 9001:2008 certificate in Q4 2009.
|
|
|
|
| 02.02.2007 |
 |
COMTEST公司为CETECOM GmbH建造10间屏蔽室 |
|
德国埃森CETECOM GmbH公司选择了Comtest Engineering公司为他们的新的无线电测试环境建造屏蔽室。所有的屏蔽室都安装了Comtes公司的包含4点闭锁系统的全自动滑动门。每间屏蔽室都使用了门卡系统,以此验证进出的人员。
|
|
|
|
| 27.09.2006 |
 |
Comtest公司为ESA-ESTEC设计产品的视频资料 |
|
要了解更多的Comtest公司建造屏蔽项目的能力,请点击下载下面的视频资料。它会展示给你所有设计,制造和安装一个大型电磁兼容性(EMC)设备必需的要求。这个视频是Comtest公司在荷兰为ESA-ESTEC设计产品时候的录象。
|
|
|
|
| 15.07.2006 |
 |
Comtest公司在荷兰为Philips建造核磁共振成像(MRI)室 |
|
基于我们在屏蔽技术上多年的经验,Comtest公司为Philips安装了核磁共振成像(MRI)室。Comtest公司在1990年就建立了核磁共振成像(MRI)室 。
Comtest公司的核磁共振成像(MRI)室采用了可折叠式铝板。这样就可以灵活方便的安装而不需要依赖外部建筑。两扇很大的手动门被安装在一个大的观察窗旁边。一个移动式控制面版能很快的很容易的安装核磁共振成像(MRI)系统。Comtest公司因为建造飞利浦医学系统而被授予最佳核磁共振成像(MRI)室厂商的称号。
|
|
|
|
| 15.05.2006 |
 |
Comtest公司为法国雷诺汽车公司制造新设备 |
|
通过和TDK和Satimo的合作,Comtest公司为位于法国欧布瓦的雷诺汽车公司制造了新的电磁兼容性(EMC)测试设备
该设备由3个独立的测试房间组成.全自动滑动门可以让操作者方便的进入每一个测试设备.
其中一间装备有roller-bench活动式系统,从而可以在汽车工作的同时进行测试.
另一间被用来测试随车携带系统.举例来说就是象车载无线电广播,sat-nav和娱乐系统.为了达到这里实验目的,一个很大的天线被安装在一个全消声室里面.这个复杂又精密的系统让雷诺公司能在15分钟内就完成原来传统的系统需要2天来完成的实验.
|
|