Semi-Anechoic Room
Compact Full Anechoic Chamber
Super Compact Chamber
EMC Test Services
Shielded Rooms
Tempest Rooms
Architectural Shielding
MRI rooms
EMC doors
Shielding Accessories
COMTEST Engineering COMTEST Engineering BV
Our business...
 
Home
Company Profile
EMC Facilities   »
EMC Equipment
Shielded Rooms   »
References
Download
EMC Notes
Used Parts for Sale
Contact Us

Chinese Mandarin  Русская Версия

Comtest
Engineering b.v.

Industrieweg 12
2382NV Zoeterwoude
the Netherlands

Ch. Of Commerce
Leiden no. 28042416

Tel   +31 71 5417531
FAX +31 71 5420375
info@comtest.eu
 
  
Our Latest News
As a supplier of shielded rooms, often mentioned: Faraday Cage we present an overview of the latest completed faraday cage projects. For a more complete overview please check our reference page as well.

04.04.2010 COMTEST receives ISO-9001 certification.

Following a process lasting almost one year, Comtest Engineering BV has had its work processes accredited to the internationally recognized quality management system standard, ISO 9001: 2008.

Awarded by Quality Masters, a Dutch leader in quality assurance for business, government and society, the designation certifies that Comtest has met the highest standards of good management practices and formalized business processes.


29.10.2009 Company news and site updating
Recently we introduced our solution for Tempest related inquiries. See tempest shielded room page.
Extension of the test services have been updated with Vvswr testing capability in accordance to CISPR 16-1-4.
Last but not least our new company brochure is available and can be viewed as a page-swapper for easy reading.

    Tempest Page   Vvswr   Brochure  

06.07.2009 April 2009 Second production run for LOFAR project
After the successful production of the first batch of RFI shielded mobile air-conditioned RFI rooms, Comtest has completed the second batch for the Radio Astronomy project of ASTRON called LOFAR.
LOFAR is a new innovative sensitive astronomical observation system operating at frequencies below 250Mhz. To produce radio pictures of the sky with adequate sharpness, cluster antennas are installed over an area of 350km in diameter.
In the Netherlands, the stations are distributed over an area of about 100 km in diameter. Several international stations are currently under constructing or planned in Germany, Sweden, the UK, France, Poland and Italy. The largest baselines across Europe will be in the order of 1500 km. The capabilities of LOFAR will increase dramatically by broadening the scope to a European level, thus creating a European Sensor Network.
More on www.lofar.org
Based on our yearlong experience for RF shielding design and production Comtest won the contract to produce and deliver the RF shielded rooms for the international stations. Comtest produces mobile air-conditioned RF shielded computer rooms housed in 20ft High Cube sea containers. The high performance shielding technology Comtest uses, ensures no interference will occur from the instruments housed in the RFI shielded room. The shielded rooms are constructed taking the advantage of the modular panel system, providing a high quality RF shielding level over a wide frequency range.

    View Big Photo

29.06.2009 June 2009 COMTEST delivers RF shield room in SKA project
Within the Radio Astronomy project called: SKA, Square Kilometer Array, Comtest delivered high performance mobile RF shielded computer rooms. Based on our yearlong experience of RF shielding design and production Comtest produced 4 mobile RF shielded and conditioned computer rooms housed in 20ft High Cube sea containers. The RFI shielded rooms will be used to house all the computer systems and have excellent shielding performances over a large frequency range. To avoid emissions reaching the sensitive antenna arrays each room is equipped with a RF sluice to ensure there is always a closed RF shielding.
More information on the SKA project and the delivery of the RFI containers can be read in this pdf file.

    View PDF file

04.06.2009 ISO 9001:2008 QA
In order to ensure our customers that we constantly strive to improve quality and reliability, Comtest has started to implement a quality management system according to the ISO 9001:2008 standards. The goal is to get the ISO 9001:2008 certificate in Q4 2009.

   

02.02.2007 COMTEST completes installation of 10 shielded rooms for CETECOM GmbH
    CETECOM GmbH, Essen Germany has selected Comtest Engineering bv for the supply and installation of shielded rooms for their new telecommunications testing environment. All rooms are equipped with Comtest full automatic sliding doors including 4-point latching systems. Each chamber can be opened using a card reader system interface which validates the entrance of persons.

   View Big Photo
Copyright © 2000-2011 COMTEST Engineering. All rights reserved.

Comtest Engineering
Send mail to CompanyWebmaster with questions or comments about this web site.